Basis of Design (BOD)

The complete Basis of Design has been developed in three-dimensional space. Aside from documentation in a form of portfolio, we provide our clients with the design in digital form and in space. Unless the details and drawings handed over in paper form are sufficient a customer may at any moment use their digital version on CD. This CD has a control program setup as well that enables a computer to display any view or detail and make a sectional view required followed by printing such a drawing with all the dimension figures necessary.

When supplying abroad we provide the complete Basic Design and Engineering Process (BDEP). However, a local project engineer shall adapt the Civil Part so the documentation complies with the local standards and system of laws. Based on the documentation in digital form, e.g. in AUTOCAD, this will cause no problem to the domestic project engineer.

Hereinafter are the examples of a number of projects developed like that:

1) Municipal WWTP for 500 inhabitants, incl. mechanical dewatering of sludge via OK - X.

2) Twin-line arrangement complete with tertiary treatment by filtration & disinfection by UV radiation and mechanical dewatering of sludge for 3500 0residents (5000m3/day).
 

3) Municipal WWTP for 1200 inhabitants, incl. mechanical dewatering of sludge via OK - X.

 
4) Municipal WWTP for 2000 inhabitants, incl. mechanical dewatering of sludge via OK - X.
   
 
5) Municipal WWTP for 1000 inhabitants, incl. mechanical dewatering of sludge via OK - X.
 
 
6) Municipal WWTP for 1200 inhabitants, incl. mechanical dewatering of sludge via OK - X.
 
7) Municipal WWTP designed for the inhabitant equivalent of 350.
   
 
8) Municipal WWTP designed for the inhabitant equivalent of 2500.
   
 
9) Municipal WWTP designed for the inhabitant equivalent of 1000.
 
10) Municipal WWTP designed for the inhabitant equivalent of 1100.
   
 
11) Municipal WWTP for the inhabitant equivalent of 3000 complete with tertiary treatment by filtration and UV radiation.